The handover is the last hour in which problems belong to somebody else. After the keys change hands and the final payment clears, every defect in the property is yours.
Most buyers and tenants treat that hour as a formality. They accept the keys, sign what is put in front of them and discover the issues over the following weeks, with no leverage left.
This guide covers what to inspect before the final payment and what to write into the handover record. It also sets out the order in which utilities connect and what to do in the first week. Procedures vary by municipality and provider, so confirm local requirements.
Before the Final Payment
Inspection belongs before the money moves, not after. Once the balance is paid, repairs become a negotiation you no longer have leverage in.
Go through the property with a list. What to check, room by room:
- Water. Open every tap and the shower at once. Check pressure, temperature and how fast the drains clear.
- Electricity. Test every socket and switch. Run several appliances together and see whether the board holds.
- Air conditioning. Start each unit on cooling and leave it running for ten minutes. Listen and smell.
- Windows and doors. Open and close everything. Look for gaps, stiff handles and seals that no longer meet.
- Walls and ceilings. Corners and window reveals, where damp shows first.
- Floors. A level across the room and a look at how doors swing.
- Fittings. Everything listed in the contract as included, present and working.
Photograph every defect with the date visible. A list without photographs becomes a disagreement about what was there on the day.
The Handover Record
A signed document at handover is the difference between a complaint and a claim.
It should state the condition of the property, list the defects found, set a deadline for fixing them and record what is being handed over. Both sides sign, both keep a copy.
| What to record | Why it matters |
|---|---|
| Defects with photographs | Establishes what existed before you moved in |
| Deadline for repairs | Turns a promise into an obligation |
| Meter readings for all utilities | Separates your consumption from the previous occupant’s |
| Inventory of furniture and appliances | With models, so substitutions are visible |
| Number of key sets handed over | Tells you how many exist |
| Access cards, fobs and parking space | Often forgotten and awkward to obtain later |
Hold back part of the payment where the contract allows it. A retained amount released once the listed defects are fixed does more than any verbal assurance. What such terms should contain is set out in the guide to the sale and purchase agreement.
Debts Travel With the Property
This is the check that costs money if skipped, and it takes one phone call.
Unpaid building charges and utility arrears attach to the property rather than to the person who ran them up. A new owner can inherit them along with the keys.
Get written confirmation from the building management that nothing is outstanding. Do the same with the electricity and water providers. Ask for it before the final payment, not after.
For resale purchases this sits alongside the wider verification work, and the full sequence is covered in the due diligence guide for resale property.
Meters: The Photograph That Settles Arguments
Small step, disproportionate value.
Photograph every meter on handover day: electricity, water and gas where present. Capture the serial number and the reading in the same frame, and note the date.
The first bill often covers a period before you arrived. With dated photographs the correction takes one visit to the provider. Without them it becomes your bill.
The Utility Chain, in Order
Connections have prerequisites, and starting them out of sequence wastes days.
| Step | What it needs | Note |
|---|---|---|
| Tax number | Passport | Required for everything that follows |
| Earthquake insurance | Title or tenancy, property details | Precondition for utility contracts |
| Electricity | Tax number, ID, insurance policy, deposit | Usually the first connection |
| Water | Same set, plus the property documents | Municipal provider |
| Gas | Same set, plus a safety inspection where applicable | Not available in every building |
| Internet | Address and ID | Longest lead time, start early |
The compulsory earthquake policy sits earlier in the chain than people expect. Without it the utility contracts stall, so arrange it first. What the cover includes is set out in the guide to property insurance in Turkey.
Start the internet order before you move. Installation appointments run days or weeks out, and remote work does not pause for them.
Address Registration
An administrative step that unlocks several others.
Your address is recorded in the national population system. That record matters for residence applications, official correspondence and a range of services that ask to verify where you live.
Do it in the first weeks rather than when something depends on it. The registration needs your tenancy or ownership document and identification, and it is straightforward when the paperwork is already in order.
The Building, Not Just the Apartment
Half of what shapes daily life sits outside your front door, and the handover is when to sort it out. Six things to settle:
- Meet the management. Know who to call and how. This one contact resolves most future problems.
- Get the house rules. Quiet hours, pets, use of common areas, restrictions on letting. They bind you from day one.
- Confirm the charge. The amount, the payment schedule and what it covers.
- Check the charge account is clear. In writing, from the management.
- Collect access cards and fobs. For the entrance, the lift, the pool and the gym, plus the parking barrier.
- Confirm your parking space. Which one is yours, and whether it is assigned or first-come.
Ask for the minutes of recent owners’ meetings if you have bought. They show what work is planned and whether a special assessment is coming. The broader picture of running costs is set out in the guide to costs and property management in Turkey.